Capabilities & methodology
What robots can do, how we measure it, and what the evidence supports. Use these definitions to read and compare robot records.
Measurements
Definitions, units and test protocols, grouped by domain. Open a measurement for its procedure and required conditions.
Autonomy5
Autonomous completionComplete a specified task without human intervention.Unit: %Higher is better
Autonomous completion · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Pre-register a task and its success criterion before collecting data. Execute 20 consecutive attempts, including failures. Record all human actions; only successful attempts with zero intervention count as autonomous successes.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Failure recoveryRecover from a controlled unexpected obstruction.Unit: %Higher is better
Failure recovery · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Introduce a stationary foam obstacle at a documented point during the room-navigation task. Success requires replanning and reaching the original goal without contact or intervention. Log all unrecovered attempts.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Intervention burdenMeasure human assistance time during operation.Unit: minutes/hourLower is better
Intervention burden · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Run a pre-registered task for at least 60 minutes of active operation. Record every assistance interval. Divide total assistance minutes by active operating hours; include remote operator time.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Intervention frequencyCount human interventions per operating hour.Unit: per hourLower is better
Intervention frequency · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Repeat a pre-registered task for at least 60 minutes of active operation. Log each operator command or physical assist with start and end times. Divide total interventions by active operating hours.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Novelty degradationMeasure loss of task success in unfamiliar conditions.Unit: percentage pointsLower is better
Novelty degradation · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Run 20 attempts on a familiar task layout and 20 on pre-registered unseen layouts with the same task and objects. Report familiar success percentage minus unfamiliar success percentage and both denominators.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Endurance & reliability4
Charging timeTime a charge between documented battery states.Unit: minutesLower is better
Charging time · Omblet protocol
Version 1 · minimum 3 attempts
- Procedure
- Use the supplied charger. Time charging from 20% to 80% indicated state of charge at 20–25°C ambient, with the robot inactive. Repeat three cycles and report battery age and all times.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Energy per taskMeasure energy consumed per successfully completed task.Unit: WhLower is better
Energy per task · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Measure battery energy or calibrated wall energy for a pre-registered repeated workload, documenting measurement boundary. Divide total energy, including failed attempts, by successful tasks; report instrument and calibration.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Mission failure rateMeasure failed missions over repeated operation.Unit: %Lower is better
Mission failure rate · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Run 20 consecutive instances of a pre-registered mission. A failure is an uncompleted mission, unplanned stop or required human intervention. Publish all outcomes and operating duration.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Working runtimeMeasure useful operation from a full battery to recharge.Unit: minutesHigher is better
Working runtime · Omblet protocol
Version 1 · minimum 3 attempts
- Procedure
- Start at 100% charge and repeat a documented workload until the manufacturer-defined low-battery threshold. Report active working minutes separately from idle and charging. Repeat three full cycles.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Interaction3
Human setup timeMeasure preparation before a useful task can begin.Unit: minutesLower is better
Human setup time · Omblet protocol
Version 1 · minimum 3 attempts
- Procedure
- Start from a stored, charged robot and an unprepared documented workspace. Time all human setup through readiness for a pre-registered task. Repeat with three novice operators; report instructions given.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Instruction followingInterpret and execute a set of natural-language instructions.Unit: %Higher is better
Instruction following · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Pre-register 20 instructions and objective completion criteria for supported tasks. Use a recorded speaker at 1 m in a quiet room. Count success only when the intended task is completed without rephrasing or assistance.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Response latencyMeasure delay between an instruction and the start of a response.Unit: secondsLower is better
Response latency · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use the same 20 recorded instructions at 1 m. Time from end of speech to first task-relevant response. Report median, all timings, nonresponses, network conditions and any offboard compute.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Manipulation5
Door openingOpen a door with a documented handle and resistance.Unit: %Higher is better
Door opening · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use a test door with fixed lever height, measured opening force and a clear guarded area. Reset latch and pose each attempt. Success requires opening at least 60 degrees without human contact.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Fine manipulationPlace small objects with measurable accuracy.Unit: %Higher is better
Fine manipulation · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Move a 20 mm foam cube into a marked 25 mm square on a level table. Randomize initial position within a documented 30 cm area. Success requires full containment without help.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Multistep executionComplete a sequence of dependent physical actions.Unit: %Higher is better
Multistep execution · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- In each trial identify a named object, retrieve it, place it in a tray, and return to the start. Publish object sets and layouts. Success requires all four steps without assistance.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Object retrievalFind and retrieve a named object.Unit: secondsLower is better
Object retrieval · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Place one target among four distractors using published randomized layouts. Give one spoken command. Time from command end until placement in the receiving tray. Report median successful time and all failures separately.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Unfamiliar-object graspingPick up unfamiliar household objects without dropping or damaging them.Unit: %Higher is better
Unfamiliar-object grasping · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use 20 previously unseen, non-fragile objects; publish dimensions and masses. Randomize their poses on a fixed table. A success is a grasp, 20 cm lift and controlled placement into a tray without damage or help.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Mobility5
Load carryingCarry a secured payload over a level route.Unit: kgHigher is better
Load carrying · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Secure a measured load using manufacturer-approved mounts. Traverse the same 10 m route for each attempt. Report maximum tested mass completed without drops, instability or assistance, and record all unsuccessful loads.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Obstacle avoidanceNavigate a route containing an unexpected obstruction.Unit: %Higher is better
Obstacle avoidance · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use the room-navigation course. Add a stationary foam obstacle after mapping, at one of five recorded positions. Success requires reaching the goal without touching it or receiving help.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Stair climbingAscend a documented staircase with a disclosed load.Unit: cmHigher is better
Stair climbing · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use a guarded test staircase and the manufacturer-approved operating envelope. Record rise, tread, number of steps and payload. Measure the largest tested rise successfully traversed in every attempt. No people on the course.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Travel speedMeasure sustained straight-line speed over a known distance.Unit: m/sHigher is better
Travel speed · Omblet protocol
Version 1 · minimum 20 attempts
- Procedure
- Use a level 10 m lane with measured run-up and stopping zones. Time the central 5 m. Report median speed and every trial time; count boundary departures as failures.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Ownership3
Cost per successful taskDocument operating expenses per successfully completed task.Unit: USD/taskLower is better
Cost per successful task · Omblet protocol
Version 1 · minimum 1 attempt
- Procedure
- Use the same cost boundary as operating cost. Divide total cost, including costs of failed attempts, by successful task count. Publish operating hours, successes, failures and itemized cost evidence.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Operating costDocument total operating expenses per active hour.Unit: USD/hourLower is better
Operating cost · Omblet protocol
Version 1 · minimum 1 attempt
- Procedure
- Over a documented observation window, sum energy, consumables, service and software costs. Divide by active operating hours. Disclose depreciation treatment, currency conversion and excluded expenses.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Purchase costDocument purchase price for a specific configuration and region.Unit: USDContext dependent
Purchase cost · Omblet protocol
Version 1 · minimum 1 attempt
- Procedure
- Record a dated quote or paid invoice for the exact configuration. Separate base hardware, mandatory accessories, taxes, shipping and recurring fees. Convert currency using a disclosed dated exchange rate.
- Conditions
- Publish the exact hardware, firmware, payload, battery state, environment layout, light level, surface, temperature, network dependency, remote human involvement and setup time. Keep these fixed across attempts. Record every attempt, including aborted runs and failures. Define success before testing. Stay within the manufacturer operating limits. This is an Omblet research protocol, not a certification or safety test.
Compare values only with their protocol, hardware and conditions. Physical and simulated tests are separate.
Evidence types
These labels describe the source and review of a record, not a performance rating.
| Type | What it tells you |
|---|---|
| Manufacturer reported | Specifications and claims attributed to their manufacturer. |
| Demonstrated | A video with disclosed control conditions. Reliability is still unknown. |
| Community tested | Owner or researcher tests, reviewed with their procedure and raw evidence. |
| Independently benchmarked | Repeatable evaluations with disclosed independence and reviewed evidence. |
Autonomy labels
Autonomy is specific to a task. These are Omblet descriptive labels, not certified levels.
- A0
- Teleoperated
- A1
- Scripted
- A2
- Task autonomous
- A3
- Adaptive autonomous
- A4
- Extended autonomous
Read alongside the label
Check intervention counts, trial outcomes, and the exact hardware and software. A label for one task does not describe everything the robot can do.
Safety and cybersecurity are independent disclosures. Read them separately in each evidence record.